To find how many cubic yards of fill dirt you need, multiply the length × width in feet by the depth in inches, then divide by 324. For example, a 10 ft × 10 ft area filled 4 inches deep is 10 × 10 × 4 ÷ 324 ≈ 1.2 cubic yards. Order about 15% more than that to allow for settling. On Dirtly the dirt itself is usually free or cheap — you're only solving the moving.
Updated July 29, 2026 · Northeast Ohio estimates, 2026
A straight-sided area or excavation — pad, footing, or pool.
You need about
7.4 cubic yards
Recommended order: 9 cubic yards
Need those ~9 yards? People give fill away free around here.
Post what you need and let it find you. About 8 taps, no typing.
Post what you needDelivered cost is a range for 1 load of clean fill — Northeast Ohio estimates, 2026. On Dirtly the dirt is often free; you're mostly paying to move it.
That's about 324 bags (40 lb each).
That's why most people order bulk at this size — or find it free on the map. Bagged usually costs several times bulk per yard.
Clean fill: Screened subsoil with no rocks, roots, or debris. Building up low areas and backfilling — the cheap workhorse for volume.
Dirt settles and compacts after it's placed, so you order a little more than the hole measures. Your soil set a starting value — nudge it to taste.
Someone near you might have this.
Dirtly is a free local map of surplus dirt. Drop a pin and a neighbor or excavator with a pile can reach out.
Drop a hole pin for 9 yards of clean fillNew to this? How Dirtly works.
Northeast Ohio estimates, 2026 · reviewed July 27, 2026. Approximate — confirm loads and pricing with your supplier.
A cubic yard is a cube three feet on every side, which works out to 27 cubic feet. The easiest way to picture it: a full-size pickup bed holds about two cubic yards, so one yard is roughly half a truckload, or a heap about waist high on a standard pallet.
What it weighs depends on the material and how wet it is. Topsoil runs about 2,200 pounds a yard, clean fill about 2,700, and clay up to about 3,000, which is roughly 1.1 to 1.5 tons. Water adds weight fast, so a rained-on load is heavier than the volume suggests. The per-material table below has the figure for each type.
Spread thin, one yard covers more ground than people expect: about 324 square feet at an inch deep, and about 80 square feet at four inches. That is why a small-looking pile fills a surprising amount of yard.
One cubic yard of dirt weighs roughly one ton, but it depends on the material and how wet it is. To convert, multiply cubic yards by the tons-per-yard figure for your soil: dry fill dirt runs about 1.2 to 1.5 tons per cubic yard, topsoil about 1.1, sand about 1.35. Ten yards of fill dirt is therefore roughly 12 to 15 tons. The calculator above shows both — use the yd³ / tons toggle on the result.
| Material | Tons per yd³ | 10 yd³ weighs |
|---|---|---|
| Clean fill | ≈ 1.35 | ≈ 13.5 tons |
| Sandy fill | ≈ 1.2 | ≈ 12 tons |
| Clay fill | ≈ 1.5 | ≈ 15 tons |
| Topsoil | ≈ 1.1 | ≈ 11 tons |
| Mixed / unscreened | ≈ 1.3 | ≈ 13 tons |
Weight rises with moisture; a rained-on load is heavier than the volume suggests.
The thinner you spread it, the further a yard goes — coverage is just 324 ÷ the depth in inches:
| Depth | Coverage per cubic yard |
|---|---|
| 1 inch | ≈ 324 sq ft |
| 2 inches | ≈ 162 sq ft |
| 3 inches | ≈ 108 sq ft |
| 4 inches | ≈ 81 sq ft |
| 6 inches | ≈ 54 sq ft |
| 12 inches | ≈ 27 sq ft |
Spreading a thin layer — top-dressing a lawn, leveling low spots, mulching beds? Use the Cover an area mode instead: pick your purpose and it adds the buffer thin layers always need.
Delivered dirt is loose and full of air. Once it's spread and compacted it settles and shrinks, so a hole that measures 10 yards needs more than 10 loose yards to finish firm and level. Adding a compaction buffer — around 15% for clean fill, more for clay — keeps you from running one short load shy on the last stretch.
Topsoil is the dark, living top layer that plants grow in, while fill dirt is the denser subsoil underneath that packs down and holds a grade. Use fill to build up the volume and cap it with a few inches of topsoil wherever something needs to grow. Our guide to fill dirt vs. topsoil goes deeper on when to use which.
The same dirt measures differently depending on where it is. Undisturbed bank dirt still in the ground swells about 20% when you dig it loose — a 10-yard hole yields roughly 12 loose yards to haul away. Run it the other direction and compacteddirt packed back into place shrinks by a similar amount. That 20% rule is why a disposal estimate (loose, in the truck) reads higher than the hole you dug, and why a fill order (compacted, in place) reads higher than the bare measurement. The calculator's compaction buffer handles the fill side for you.
Digging dirt out loosens it, so a hole that measures 10 yards in the ground yields roughly 12 loose yards to load and haul — that same ~20% swell from above. In Northeast Ohio, getting that dirt gone runs from a few hundred dollars for a short DIY dump run up to $1,400–$2,300 per load for full-service removal (Northeast Ohio estimates, 2026). The cheaper path is usually a neighbor: if someone nearby needs fill, the haul is your only cost — or it's free when they come pick it up. That's the whole idea behind free fill dirt on Dirtly. For every option, cheapest first, see our guide to what to do with excess dirt.
Local price context: see fill-dirt figures for topsoil and fill in Kent and fill dirt prices in Ravenna, or find your own town in Northeast Ohio. Seeding a new lawn on top? The grass seed calculator works out pounds and bags.
Someone near you might want this.
Post your pile on the free local map and a neighbor filling a low spot can take it off your hands.
Drop a mound pinPrice figures: Northeast Ohio estimates, 2026 (delivered loads; haul-away via HomeGuide 2026) · Math: standard cubic-yard conversion (L × W × D ÷ 324) · Reviewed July 29, 2026.
Dirtly is a free local dirt map — browse surplus dirt and topsoil posted by neighbors and excavators near you.